FP-1000/1200/1500
Modular Wall System Installation
To
ensure the correct placement
of door openings and
corners, cut the bottom
track tube lengths at
least 12" shorter
than the location of a
door opening or corner.
Now insert all the panels
you can up to that cut.
Measure from the edge of
the last panel you installed
to the cut end of the bottom
track tube. Add 5/8” to
the next panel width that
you are going to install.
Cut a piece of bottom track
tube to that size and install
it. Then insert the next
panel and stud. This should
insure that the end of
your panels will coincide
with the end of your tracks.
Installing
the panels from the floor
to a suspended ceiling
 
Cut
1/2” plywood
to the same size as the
ceiling panels. Place them
on top of the ceiling panels
running in direction of
the track.
Installing a top track
Drill
and countersink clearance
holes through the top
track that will best
suit your ceiling pattern.
Try not to exceed a distance
of 24” between
these holes. Do not drill
into the ceiling grids
of a suspended ceiling
in case you remove the
divider in the future.
Maintain a straight installation
of the top tracks by snapping
a line on the ceiling or
by measuring over from
a straight ceiling grid.
Lift the top tracks into
place and secure with appropriate
flat head fasteners (not
included). In a permanent
ceiling, find secure anchoring
or use appropriate fasteners
to insure a stable wall.
In a suspended ceiling
make sure the flat head
wood screws (not included)
are long enough to penetrate
through the top track,
through the ceiling panel
and the plywood.
Installing
a floor track tube
In ceiling mounts, plumb
down from the top track
on each end of the wall
and make a mark on the
floor. Snap a line across
the floor using these marks
as your guide insuring
that the bottom track tube
will be located exactly
below the top tracks.
Fasten your floor track
tube to the floor with
the appropriate flat head
fasteners (not included)
that best suit your flooring
material.
For
installations that must
be removed frequently,
you can install “locator
pins” that extend
below your bottom track
tubes. These pins will
fit into holes that you
drilled into the floor.
You can also request a
Velcro type material that
will fasten unto carpet.
Installing
panels
After
the floor tube and applicable
top support is installed,
begin mounting the panels
by placing them on top
of the floor track. When
installing the panels,
it is important they are
all checked to make sure
they are straight and plumb.
Place the vertical “stud” tubes
between each panel. If
the installation is less
than the ceiling height,
install the first two panels
and then begin fastening
the top horizontal tube
to these panels.
Panels
will be fastened with
a #6 screw to the floor
tubes, vertical “stud” tubes
and when applicable the
top horizontal tubes.
Door installation
Install
the floor track tubes,
panels and studs up to
the door location. Continue
installing the floor
tube, one stud and one
panel on the opposite
side of the door opening.
Insert the door header
between the studs and fasten
it in place making sure
that the top is the same
height as you other panels.
Attach the header tube
to the bottom of the header
panel with the #6 screws.
Fasten the 3” channels
to the tubes around the
rough opening with #6 screws
as shown in the drawing.
Install the frame and door
according to the supplied
instructions.

Finish
Inspection
Check all work for proper
installation making sure
the panels protrude into
the top track sufficiently.
Panels may be cleaned with
mild detergent and water.



|